Berg Engineering Consultants, Ltd.

office (847) 352-4500
fax (847) 352-4815


Find BEC on Facebook   Find BEC on Linkedin  Find BEC on Twitter

Charles A. Easley A.I.A.

Principal

Chuck joined Berg Engineering Consultants, Ltd. in January of 2003 as Electrical Department Chairman. In September of 2006 Chuck vested himself into Berg Engineering Consultants, Ltd. as an equity Owner. He is a member of the executive committee.

Chuck’s previous experience includes 15 years at another electrical consulting firm and 4 years at Hewitt Associates.

Daily responsibilities include client coordination, project design, supervision of project document production, shop drawing review and observation of construction.

Project design experience:

  • Lincoln Way North, new high school, medium voltage distribution and co-generation.
  • Prairie State College Campus Wide Mass Notification System.
  • Byron School District IP Network Security Camera System for the High School and Elementary School.
  • Lyons Township H.S. Band/Choral Remodeling; Fieldhouse, Pool and Auditorium Additions.
  • Marist High School Library and Cafeteria Additions and Remodeling.
  • Byron School District Middle School and Auditorium.
  • Freeport Memorial Hospital Cath Lab.
  • Rockford Memorial Hospital Fire Alarm Replacements.
  • Hinsdale South H.S. Medium Voltage Switchgear Replacement.
  • Marist H.S. Fire Alarm and Intercom Replacement.
  • LaGrange Elementary School District 205 Lighting Upgrades.
  • Hewitt Associates Corporate Headquarters and Data Center. Electrical Cost $19.1M.*
  • Hewitt 98 Building, Command Center and Data Center.*
  • U O P continuous process laboratory.*
  • Evanston Hospital Lobby and Parking Structure, Power Plant Upgrades, MRI, Angio Lab, Nuclear Med and ER Renovations.*
  • Evanston Hospital Data Center.*
  • Glenbrook Hospital MOB & Outpatient Wing, 100,000 square feet, and Power Plant Expansion.*
  • Swedish Covenant Hospital Outpatient & Surgical Building, 220,000 square feet, Total Cost $45,000,000.00.*
  • Lake Forest College, Reid Hall Renovations.*
  • Lake Forest College, Hotchkiss Hall Renovation.*
    *Project Experience at another consulting firm.
Chuck Easley

EDUCATION

BA - University of Illinois, Champaign 1983
MBA - Illinois Institute of Technology 1996

PROFESSIONAL REGISTRATION

Registered Architect - State of Wisconsin

PROFESSIONAL ORGANIZATIONS

American Institute of Architects
AIA - North Eastern Illinois
Illuminating Engineering Society
IEEE Industry Applications Society, Chicago Section

 

See  Chuck Easley on LinkedIn